Remodel of shower stall in the master bedroom. The original conversion from soaking tub to shower enclosure was done in 2016, this was just a remodel, which involved only enclosure and fixtures. This consist of removing the 42 inch soaking tub, tub shower doors, and cultured marble enclosure; relocating the drain pipe, removing the tub sprout. The remodel consist of a 36 inch shower base, a Kohler Choreograph cultured marble enclosure, 6 foot brushed nickel shower doors and a Moen Shower faucet and head. I reinforced grab bar and Kokler stainless steel shelf were added. The hardest part of the job was grinding/sanding off the original cultured marble enclosure adhesive, and tiling the floor (gap left between original tub and shower base).
|