South side of house: 1. All weeds, rocks, workbenches, flagstone walkway, 6" x 12" wood post set in concrete, 2" x 10" wood trim used for plants were removed. 2. The ground was then leveled and tappered away from the house. Both left and right leaders were extended in to 4" drain pipes each extending 15' from the house. 3. The Rain Bird irrigation system was fixed (leaked in various places}, the first and third zones were retained through a new master control valve. 4. Then 3" of 1/2" colored river rock was racked out to cover the entire area.
|